From BNI Building News
Back Cover
- Plumbing
- Sprinklers and Fire Protection
- Heating, Ventilating and Air Conditioning
- Electrical
- Free Estimating Software and Data
The mechanical and electrical portions of a building typically account for 30% or more of the construction costs. This type of work is very specialized and includes many various types of materials and installations which require detailed pricing - piping, valves, ducts, fans, chillers, condensers, conduit, transformers, etc.
All of these technical areas are covered. All costs are organized according to the industry standard CSI MASTERFORMAT which allows even the non-specialist to estimate easily. Over 8,000 unit prices, broken down into material and labor costs, and complete man-hour tables provide maximum coverage and flexability.
|